Uploaded on Oct 23, 2021
When you are selecting vacuum furnaces for your industrial application then you should consider some factors. Some factors such as weight capacity, work area, temperature consideration, vacuum performance, hot zone construction, vacuum system components, furnace chamber design, electrical equipment & controls, etc. So make sure to look into each factor before selecting vacuum furnaces for your industrial application. For more details visit:- https://www.launchora.com/story/what-factors-you-should-consider-fully-when-select
What Factors You Should Consider Fully When Selecting Vacuum Furnace for Your Application?
What Factors You Should Consider Fully When Selecting Vacuum Furnace for Your Application? Want to invest in vacuum furnace for brazing? Or for vacuum heat treatment, vacuum sintering, annealing, thermal processing in your industrial application? All these are extremely important procedures and must be executed with the finest furnace. If you start scouting for vacuum furnaces, then you will see that there are hordes of options available – including graphite crucible & wafer, tungsten crucible & wafer in laboratory vacuum furnace, as well as tungsten crucible & wafer, graphite crucible & wafer in benchtop furnace. Considerations to Make When Shopping for Vacuum Furnace? Weight Capacity Work Area Temperature Consideration Vacuum Performance Hot Zone Construction Vacuum System Components Furnace Chamber Design Electrical Equipment & Controls Power Supply Gas Cooling System Weight Capacity You need to ensure what maximum load weight at a specific elevated operating temperature can be processed. Work Area What load size can be processed is the consideration for determining the effective work area. This is important so you are able to buy fit-size furnace hearth and not larger than that because it will increase operating cost. Temperature Consideration What your requirement is pertaining to high temperature furnaces operation? This is an important consideration. Most furnaces come with a capability to operate at 2400°F, while for higher requirement added temperature capability can also be availed. Temperature operating uniformity across the furnace range should be looked into, exploring all the options. Vacuum Performance For blower/mechanical pump furnace, ultimate vacuum is in range of 20 Microns Hg or more. For diffusion pumped, ultimate vacuum range is 10‐6 Torr. There should be approximate 10 minutes time period from pump-down to high-vacuum cross-over. Hot Zone Construction Acceptable insulation package has to be considered based on the industrial standards pertaining to thick 304 stainless steel structure and flaxshield. This is important to reduce moisture absorption and reduce chances of oxidization and rusting. Heating element insulators must be used in a way that these are protected from contaminating vapors. Vacuum System Components The mechanical pumps have to be of high quality, and must provide for large reservoir for efficient functioning during hot & humid days. Vacuum blower pump is also another important component that has to be considered with good research. Furnace Chamber Design The basic construction of the furnace design has to be well thought out. It must conform to the industry standards and codes, and must be able to properly allow water circulation. The chamber door design must be like it allows for proper personnel safety during the autoclave movement. The door should be able to avoid seal failure and dirt collection. Electrical Equipment & Controls A centralized, easy to operate cabinet, conforming to the industry standard, is important to house the electrical controls. For proper control and monitoring of the furnace, a cabinet that houses temperature controller, programmable controller and other controllers and recorders for smooth operation is much-needed. Power Supply An advanced power supply with complete controls including the trim control has to be provided within the cabinet. It must be able to remove any possibility of power flow problem in the transformer. Gas Cooling System Both internal and external cooling systems have to be considered fully, so these are able to provide easy access to heat exchange, drive motor, eliminate drive motor shaft rotating seals. Gas nozzles have to be optimum in allowing for accelerated gas flow, and ensure proper functioning throughout the hot zone & front door main section. Address:- 29-30 Brunel Rd, Hastings, Saint Leonards-on-sea TN38 9RT, England, United Kingdom Phone:- +441424850811 Website:- http://thermic-edge.com/ Reference:- https:// www.launchora.com/story/what-factors-you-should-con sider-fully-when-select
Comments